Finishing Specification
Fully Finished Apartment in Hurghada: What Should the Specification Include?
A buyer checklist for understanding 'fully finished' and 'turnkey' wording before assuming what will actually be delivered inside the apartment.

Quick answer
'Fully finished' or 'turnkey' should never be treated as a complete specification by itself. Ask for the written scope for floors, wall and ceiling finish, internal and external doors, sanitary ware, bathroom fixtures, electrical points, lighting, air-conditioning provision, kitchen scope, windows, balcony finish and any appliances or furniture. The contract and annexed specification should control what is delivered, not a generic label or a furnished render.
Key takeaways
- Fully finished and fully furnished are different concepts; furniture and appliances must be confirmed separately.
- Ask for product categories or standards where they matter instead of relying only on words such as premium or luxury.
- Confirm AC, kitchen and lighting scope because these items are often interpreted differently by buyers.
- Keep the finishing specification with the exact unit documents used during reservation and contract review.
- At handover, inspect the delivered apartment against the agreed specification rather than against a marketing render.
A finishing label is not the same as a finishing specification
A brochure needs short language, so terms such as fully finished, turnkey, luxury finish or ready to move can appear as convenient summaries. The buyer needs the detailed version. A written finishing specification explains what materials, fixtures, systems and preparation are included in the delivered apartment and what remains outside the developer's scope.
Do not assume that fully finished includes furniture, loose appliances, curtains or a complete fitted kitchen unless those items are expressly listed. Likewise, an image of a furnished interior can illustrate design intent without proving that the furniture appears in the purchase price.
Use a room-by-room finishing checklist
| Area | What to confirm | Common assumption to avoid |
|---|---|---|
| Floors and walls | Floor material, skirting, paint or wall finish and wet-area treatment | Assuming the render proves the exact material |
| Doors and windows | Door type, hardware, glazing and window finish | Assuming all internal doors or balcony systems are identical |
| Bathrooms | Sanitary ware, mixers, shower area, mirrors, accessories and ventilation | Assuming every visible bathroom item is included |
| Electrical | Sockets, switches, distribution board, data/TV points and lighting scope | Assuming decorative light fittings are included |
| Air conditioning | Installed units, provision only, capacity responsibility and drainage | Assuming 'AC ready' means AC units are supplied |
| Kitchen | Cabinetry, worktop, sink, mixer, appliances and connections | Assuming a finished apartment includes a full fitted kitchen |
| Balcony | Floor finish, railing, drainage and external lighting if applicable | Ignoring outdoor finish until handover |
Fully finished is not the same as furnished
A fully finished apartment can still be an empty home that needs beds, sofa, dining furniture, wardrobes, curtains and loose appliances. A furnished apartment includes some or all of those movable items, but the quality and inventory can vary widely. Keep the two decisions separate: first confirm the permanent building finish, then confirm any furniture or appliance package item by item.
Permanent finish
Part of the building
Flooring, wall finish, doors, sanitary ware, fixed electrical systems and other agreed installed elements.
Furniture package
Movable contents
Beds, sofas, tables, chairs, curtains, loose appliances and décor should be identified separately.
Kitchen and AC
Clarify explicitly
These can sit between categories in buyer expectations, so confirm exactly what is supplied and installed.
How finishing changes the real cost of two apartments
A lower headline apartment price can become less attractive if the buyer must immediately fund major finishing work. The opposite can also be true: a higher-priced fully finished unit may include items you would replace anyway. Compare the exact included scope, then create a separate post-handover budget for everything not included.
- 1
List included permanent items
Use the written specification, not a marketing sentence.
- 2
List excluded setup items
Furniture, appliances, curtains, kitchen elements or AC units should be budgeted only if not included.
- 3
Add time and coordination
Overseas buyers should consider who will manage any post-handover work and how it will be checked.
- 4
Compare like for like
Only then compare the all-in practical cost of moving into each option.
At handover, inspect against the agreed specification
The handover inspection should answer a simple question: has the apartment been delivered in line with the agreed unit description and finishing scope? Bring the relevant documents, inspect room by room, record defects or incomplete work and follow the project's documented snagging process. This is different from deciding what the specification should contain; handover is where you test the delivered result.
- Bring the final agreed finishing specification and unit plan.
- Photograph each room before signing the receiving record.
- List incomplete or defective items clearly instead of writing a vague note.
- Confirm who owns each corrective action and the follow-up route.
- Keep finishing disagreements separate from later furniture choices.
What Kayan currently says about Blue Crest finishing
Kayan's current Blue Crest project page states that the apartments are fully finished to turnkey standards. Buyers should still request the current detailed finishing specification for the exact unit and phase they are considering. That written scope is the right place to confirm kitchens, AC, lighting, sanitary ware and other details that a project-level phrase cannot fully describe.

Frequently asked questions
What does fully finished apartment mean in Hurghada?+
It generally indicates that the apartment will be delivered with permanent interior finishes rather than as a bare shell, but the exact scope is project-specific. Ask for the written specification covering floors, walls, doors, bathrooms, electrical work, AC, kitchen and any included fixtures before relying on the label.
Does fully finished mean fully furnished?+
No. Fully finished normally describes permanent building finishes, while furnished describes movable contents such as beds, sofas, tables and often appliances. Confirm the exact inventory because a rendered furnished room or a 'turnkey' phrase does not automatically mean all furniture is included.
Does a fully finished apartment include air conditioning?+
It depends on the project's written specification. Some projects may include installed AC units while others may provide only preparation, drainage or electrical points. Ask whether the units themselves, installation and controls are included for the exact apartment you are considering.
Does a fully finished apartment include a kitchen?+
Not necessarily. Confirm cabinetry, worktop, sink, mixer, appliances and utility connections separately. A finished apartment can still require a kitchen package or appliances after handover, so the written specification should control your budget planning.
Are Blue Crest apartments fully finished?+
Kayan Development's current Blue Crest page states that the apartments are fully finished to turnkey standards. Buyers should still request the current detailed specification for the exact unit or phase to confirm what is included and excluded before reservation or contract signing.
Next step
Request the current Blue Crest finishing specification
Before comparing units, ask Kayan for the exact current finishing scope and what remains for the buyer to supply after handover.
Related buyer guides
About this guide
Written by the Kayan Development editorial team for buyers comparing homes in Hurghada. Project-specific facts are based on Kayan Development's published Blue Crest information. Legal, engineering, planning, and maintenance decisions should be confirmed with the relevant authority and an independent qualified professional.
Data reviewed: October 6, 2026. Recommended review interval: 90 days, or sooner when Blue Crest finishing specifications or current unit offers change.
Sources and further checks
- Kayan Development - Blue Crest - First-party statement that Blue Crest units are fully finished to turnkey standards
- Kayan Development - apartment handover checklist - Existing handover owner page; handover inspection is summarized rather than duplicated here